An action is not the result
An agent can answer “Done” even though the goal has not been achieved. It can also issue a tool call, receive a response saying the request was accepted, and still leave the work pending or incomplete. These are different claims, and they require different evidence.
It helps to distinguish three states. First, the agent attempted an action—for example, it sent an instruction to change a record. Second, the system that received the request accepted or responded to it. Third, the final state requested by the person exists and meets the agreed conditions. Only the third state, on its own, shows that the goal was achieved.
This distinction matters because a success response may refer to only one part of the process. “Request received” does not necessarily mean “change saved”; “test run” does not mean that every requirement for the change has been met; and “booking requested” is not the same as a confirmed booking. The agent’s answer can summarize what happened, but it should not become the only evidence of what happened.
Agent evaluation is concerned with checking whether systems that take actions can complete work reliably. This article has a narrower focus: deciding what evidence is sufficient to accept a particular task as complete. The recommendations and examples below are a practical method, not a claim that there is one universal signal that works for every agent or tool.
Three claims, three levels of evidence
| Claim | What it demonstrates | What it does not demonstrate on its own |
|---|---|---|
| The agent issued an action | The agent attempted to send a request or perform a step. | That the tool received or accepted it, or produced the desired state. |
| The tool responded or accepted the request | A component responded and, depending on what the response means, may have accepted the request for processing. | That the change was saved, is no longer pending, or meets every requirement. |
| The final result meets the criteria | A relevant check observed the agreed state. | That unchecked requirements have been met, or that the evidence will remain current indefinitely. |
Step 1: Turn the request into an observable final state
Before carrying out a task, restate the request as a description of how things should look when the work is finished. “Update the record” is ambiguous: it does not say which field should change, what value is expected, or whether other data must remain untouched. “Make the code change” does not specify the expected behavior or which conditions must continue to hold.
A useful description identifies the affected object, the desired state, the conditions that must be preserved, and any relevant limits. You do not need to turn every request into a lengthy specification. You do need to resolve ambiguities that would change the decision about whether the task is complete.
The observable result should be expressible without relying on the agent’s intentions. Instead of “the agent handled the booking,” specify what would need to exist before you could say it was confirmed. Instead of “the agent fixed the code,” define the expected behavior that should work and which checks are relevant to the change.
Also define what is out of scope. If the request was to update one field, do not assume the agent was supposed to modify other fields, notify other people, or review the entire history. This boundary helps avoid two opposite errors: accepting a partial task as complete and expanding the assignment without authorization.
A short template for describing the result
- 01Object: Which record, change, booking, or other item will be modified?
- 02Expected state: Which value or condition must exist at the end?
- 03Additional conditions: Which other requirements must be met or remain unchanged?
- 04Boundary: What is not part of the task?
- 05Evidence: What observation would distinguish the final state from a mere request?
Step 2: Agree on acceptance criteria before acting
Acceptance criteria spell out what must be observable for the request to count as complete. It is better to define them before carrying out the action: afterwards, it is easier to mistake a convenient output for adequate proof or lower the bar to justify a partial result.
A useful criterion is specific and checkable. “The record is correct” leaves too much room for interpretation. “The status field shows the agreed value for the identified record” names both a state and an object. If it also matters that other fields remain unchanged, that should be stated as an additional criterion.
Not every requirement can be checked with a single signal. A change may require that a value exists and that another attribute has not been altered. A booking may require both confirmation and correct details. A code test may cover important behavior without proving, by itself, that every requirement in the request has been implemented. The list should reflect the actual conditions of the request, not just the ones that are easiest to measure.
For open-ended requests, clarification may be needed first. If there are several reasonable interpretations and the difference affects what counts as an acceptable result, the agent should not silently choose one and later treat it as the only possible interpretation. The agreed criteria also determine when a task is only partly complete and what information needs to be communicated.
Step 3: Choose evidence that supports the claim
Evidence should answer the specific question: what allows us to say that the desired final state exists? A tool output may be suitable for determining whether a request reached a particular component, but not necessarily for proving that the result was persisted or meets every requirement. Do not assign a signal more meaning than it actually has.
When possible, check the state through a relevant read of the affected system or a check that evaluates the result directly. For some work, evidence may be an automated test; for other work, it may be a visible confirmation in the source that manages the state. “Independent” does not always mean “from a different provider.” It means that the agent’s own claim that it completed the task is not being used as the only proof.
Independence also comes in degrees. Asking the agent again whether it finished may simply repeat its claim rather than verify it. Consulting a record view can provide an observation of the state, but you need to know what that view represents and whether it refers to the right object. A separate source may offer more of a cross-check, provided it actually measures the requested result.
The evidence must be linked to the right criterion and object. A successful code test does not automatically establish requirements it does not cover. A booking confirmation is useful only if it refers to the requested booking and its details match what was agreed. If you cannot establish that link, state the uncertainty instead of filling the gaps with assumptions.
How to decide whether a signal is sufficient
| Question | If yes | If no |
|---|---|---|
| Does the signal observe the final state, rather than just the request? | It may support a claim about the result if it refers to the right object. | Limit the claim to saying that a request was issued or received. |
| Does it check every important acceptance criterion? | It may support completion with respect to those criteria. | State only which criteria were checked and identify what remains. |
| Is the check distinct from the agent’s claim? | It provides an additional basis for cross-checking the result. | Do not present a repeated claim as independent verification. |
| Is the evidence clear and free of contradiction? | The result can be communicated within the scope it supports. | Keep the status uncertain or partial and request an appropriate review or check. |
Step 4: Separate execution from verification
The component that performs an action and the component that checks its result have different roles. In a simple workflow, the same agent may call a tool and then query the affected system. Even so, the second operation must provide an observation of the state, not merely repeat that the first operation succeeded.
In higher-impact systems, it may be preferable for verification to follow a different path from execution, or for a person to review it. Separation reduces the risk of treating one response as both the action and its proof. This is not an absolute rule: the appropriate degree of separation depends on the risk, the ambiguity of the task, and the quality of the available signals.
Automation may be sufficient when the criteria are clear, the check covers the relevant result, and possible errors have limited consequences. Human review becomes more important when instructions allow several interpretations, consequences are significant, evidence is inconclusive, or contextual judgment is needed that an automated test does not represent.
Requesting human review does not automatically make a conclusion correct. The reviewer needs to see what was requested, which criteria were agreed, and what evidence was observed. Approval without those elements can become another unsupported “yes.” Review should resolve a specific question, not be a formality disconnected from the result.
Proportional escalation of verification
- 01Automated verification: use it when the expected result is defined and an appropriate signal checks it.
- 02Automated verification plus review: combine both when the test covers part of the result but an interpretive question or concern about impact remains.
- 03Human review before accepting the result: use it when important ambiguity cannot be resolved with the available signals.
- 04No sufficient confirmation: do not declare the task complete; communicate what is known and what uncertainty remains.
Three worked examples
The following examples illustrate the method using hypothetical criteria. They do not describe a specific tool or product, and the available signals vary by system. In each case, the key is not to elevate an acceptance response into proof of completion without checking what that response means.
For a record update, the request may be to change a particular field. The issued action demonstrates an attempt; an acceptance response may indicate that the system received the request. To declare the work complete, observe the right record and check the agreed value. If the request also required other data to be preserved, include that in the verification. If the system shows only that the change is pending, the result does not yet meet a criterion that requires the value to appear in the record.
For a code change, the task is not defined by the fact that a patch was produced or a success response was returned. Before carrying it out, clarify the expected behavior and which conditions are part of the assignment. Then use checks relevant to that behavior and review criteria the checks do not cover. A test finishing without errors provides evidence about what that test ran; it does not automatically prove every functional or quality requirement in the request.
For a booking, the difference between requesting and confirming is decisive. The agent may send a request and receive a response that does not clarify whether the booking was confirmed. The evidence must let you identify the relevant booking and compare the details with what was agreed. If there is only a pending request, or the necessary details cannot be confirmed, the final message should say so rather than present the booking as completed.
Applying the method to three tasks
| Task | Result to check | Signal that is insufficient on its own | Relevant check |
|---|---|---|---|
| Update a record | The right record shows the agreed value and any additional conditions are met. | The agent saying “updated” or a request being accepted. | Observe the affected record and compare the value and other agreed criteria. |
| Deliver a code change | The change meets the requested behavior and specified conditions. | A patch existing or an isolated test completing successfully. | Check behavior with relevant tests and review what those tests do not cover. |
| Confirm a booking | A confirmed booking exists with the agreed details. | A request being sent or an ambiguous response being received. | Cross-check a confirmation linked to the booking and its relevant details. |
Partial, contradictory, or unverifiable results
If only some criteria are met, describe the result as partial. Do not turn “the action was accepted” into “the task is finished” to offer a more convincing sense of closure. Avoid the opposite extreme too: if valid evidence supports some requirements, state which ones rather than presenting all the work as unknown.
If two signals conflict, pause before drawing a conclusion until you clarify what each one measures and which state it refers to. A positive response may refer to receipt of the request while another observation shows that the final state has not yet changed. This may not be a true contradiction; it may be a difference in process stage. But until the difference is resolved, it does not support a complete success claim.
If there is no suitable way to observe the result, the right conclusion is that it could not be verified—not that the agent necessarily failed or necessarily succeeded. Communicate the action that was attempted, the response observed, and the criterion still pending. A lack of evidence about the final state does not, by itself, establish what that state is.
Keep the description of the result proportional to the evidence. “Request sent” differs from “request accepted”; “change observed in the field” differs from “all requirements checked”; and “selected tests completed” differs from “no problems remain.” A precise message helps the recipient decide whether to wait, review, or accept the task.
A checklist for designing a workflow
Agent evaluation may consider whether a system that performs actions completes work reliably, and tests can help interpret particular executions. But a score, an execution status, or a tool response does not replace defining the result that matters for a particular task. The team must translate the request into observable criteria and connect each conclusion to the evidence that supports it.
Before accepting or reporting a task as complete, work through this checklist. If you cannot answer a question, that does not always mean the task failed; it does indicate that you should limit the claim, obtain the missing evidence, or request a review appropriate to the impact.
Final checklist
- 01Is the final result described in observable terms, rather than only as an action by the agent?
- 02Have the right object, acceptance conditions, and task boundaries been identified?
- 03Does each important criterion have a signal that can check it?
- 04Does the signal demonstrate the final state, or only that a request was issued or accepted?
- 05Does the verification refer to the right object and cover the requirements being declared complete?
- 06Do ambiguity, the impact of error, and the quality of evidence justify automation, human review, or both?
- 07Does the final message distinguish what is confirmed, what is partial, and what remains unverified?
Open questions
- The specific signals for checking a record, code change, or booking depend on the tools and systems used; the supplied sources do not specify particular interfaces or statuses.
- The examples are hypothetical application scenarios, not descriptions of integrations or guaranteed product behavior.
- The supplied sources provide context about agent evaluation and testing, but do not establish a universal standard for independently verifying final state.